Boilers

Products

    Model 400

    Model 800 

    Model 848 

    Model 8000

Types of Use

    Fuel

    Water

    Residential

    Commercial

    Industrial

SEARCH


Manufacture
Lifetime Warranty

SHOPPING BASKET

SHOPPING BASKET

Items: 0
Subtotal: $0.00
Note: All prices in US Dollars

Boilers

GMX Boiler InstallationIf the boiler has existing scale when the magnets are installed, expect the total dissolved solids (t.d.s.) to show an increase in a water test. This is due to the scale being removed from the boiler. Water in the sight glass of a steam boiler will exhibit a light turbidity, the colour of rusty mud. This is normal and desirable. When the boiler is opened for inspections, this same material seen in the sight glass will have formed a thin coating on the boiler tubes. This coating is easily wiped or rinsed off, and has no insulating properties. It does not inhibit heat transfer. However, this coating will help protect the boiler tubes from corrosion and oxygen damage.

After approximately four days to two weeks, the magnets will start to remove any existing scale. The residue will be visible in the blow down water. When the water again runs clear, the boiler should be free of all scale. Temperature variation between water temperature and stack temperature should stabilize at 150 degrees. This is another indication that the boiler is now scale free. Hot water boilers will exhibit a similar presence of removed scale in the blow down process. The blow down water may develop a slight reddish brown color during the first few seconds of blow down. Again this is normal and desirable and an indication that the magnets are functioning as designed.

RESULTS / BENEFITS

Any existing scale will be removed, and no further accumulation should occur. Greatly improved heat transfer means a reduction of fuel needed to heat water and cost reduction. Maintenance cost will also be reduced. Since scale can cause hot spots and premature tube failure, boiler life will be extended. The need for chemicals can be greatly reduced or eliminated with a result of additional cost savings and environmental benefits.

boiler

Cooling Towers

The common problems faced by cooling tower industries are scale and algae formation and corrosion. They have to use different chemicals to control the above three factors.

Installation of GMX fluid conditioners is the permanent solution for protecting the pipelines from scale formation, corrosion and algae formation. The need for chemicals can be eliminated with a result of additional cost savings and environmental benefits. As GMX fluid conditioners removes existing scales and Algae and prevents further formation of scale, the life of cooling towers will be extended and the maintenance cost will also be reduced.